_MG_0339MAN

MAN PrimeServ was commissioned to conduct an engineering study in which it would develop a concept for the upgrading and modernization of an approximately 50-year-old machine train. The high-pressure steam turbine was already replaced in 2002 as part of a footprint solution. The aim of the engineering study was, in particular, to investigate upgrading the low-pressure steam turbine for a continued service life of 30 years as well as increasing efficiency and availability through the use of current technology. 

  • Tailor-made modernization concept
  • Use of contemporary technology
  • Short plant shutdown time

  • Dec 11, 2014

    Publication Thumbnail
    Steam Turbine Revamp
    For the long-term upgrading and optimization of an existing plant, MAN PrimeServ has installed a footprint steam turbine type DK063/80R featuring contemporary technology.
    PDF, 711.89 KB